Home> Vessels> QP-2000
QP-2000
Quippo Prakash Pte Ltd., Singapore

Quippo Prakash Pte. Ltd, Singapore, a closely held company was incorporated on 29th April 2008 under the Singapore Companies Law (Regn. No 200808322H). It now owns & operates a newly built state-of-the-art Derrick Pipe Lay cum Accommodation Barge (DLB) – Quippo Prakash (QP-2000). a non self-propelled QP is the largest in the South Asian region owned by Indian promoters. The key specification and features of the QP are –

Crane capacity : Main 2000 MT
Barge Dimensions : 120 Mtr X 40.1 Mtr X 9 Mtr
Pipe Laying capacity : from 8” to 60” coated upto water depth of 180 meter
Accommodation : 303 persons (consisting 1 man, 2 men & 4 men cabins).
Mooring System : 12 X 100 ton - Electric Drive Mooring System
Classification : ABS
Flag : Panama
   

QP-2000 was commissioned in 2010 and deployed in South East Asian region where it has done projects for Petronas, Malaysia, Shell, Malaysia, Pt Timas, Indonesia during 2010 & 2011.

 

For detailed technical features presentation
For detailed technical specifications
To watch launching ceremony video of Quippo Prakash
To see DLB QP-2000 commencing Jacket Lifting

QP-2000 is the joint ownership among MDL, Srei Infrastructure Finance – India (www.srei.com) and Sapura Crest Petroleum -  Malaysia (www.sapuracrest.com.my).

To contact for business enquiries


Technical Specification

120M ACCOMMODATION / DERRICK PIPELAY BARGE



SUMMARY OF TECHNICAL SPECIFICATION

 
I OVERALL DIMENSIONS

Length overall 120m
  Beam moulded 40.1m
  Depth moulded 9.0m
  Draft designed 6.5 m (approx.)
  Main Deck Strength 12.5 to 15 Tons/ M2
  Class ABS , *A1
II ACCOMMODATION
  8x 1‑berth cabins  8 men
  14 x 2‑berth cabins  28 men
  66 x 4-berth cabins  264 men
  Total      300 men
III TANK CAPACITY
  SWB (Non-Potable) 15300 M3  approx.
  F.W. Tank (Potable)                   2000 M3  approx.
  F.O. Tank 2160 M3  approx.
  Dirty Oil Tank 15 M3  approx.
  Hydraulic Oil Tank 10 M3  approx. 
  Lube Oil Tank 10 M3  approx
IV SERVICE CONDITIONS
  Ambient air temperature 45 deg C (max)
  Relative humidity 95% (max)    50% (min)
  Sea water temperature 35 deg C (max)
  Wind velocity 18m/sec
  Wave height (Hs) - Significant 3.0 m (12 sec)
  Current velocity 2 Knots
  Water Depth
            Lifting Operations mode 9m to 150 m
            Pipelay Operations pipelay mode 6m to 150 m
            Pipelay Operations standby mode  20m to 150m
V NAVIGATION & COMMUNICATION EQUIPMENT
  Helicopter Communications Equipment  
                1 set VHF AM Transceiver 131 MHz and 130 MHz
                1 set Non‑directional Radio Beacon 100 watts RF output adjustable and 4 programmable coding letter boards
 

              Two (2) sets aviation portable radio

Complete with microphone headset for Helicopter Landing Officers (HLO).
  Six (6) Walkie Talkie Multi‑channel walkie talkies with clip on microphone
  Intercom / Public Address System
               Internal telephone system  
               PA system  
  Echo Sounder for 200m working depth  
  Aldis signal lamp  
  Anemometer for wind speed and direction  
 

One (1) set DGPS satellite navigator

 
  Two (2) independently operated radars Minimum range of 48NM
  One (1) gyro compass with at least (1) repeater complete with azimuth mirror
  One (1) magnetic compass  
  GMDSS console  
  Radio communications equipment  
               2 sets VHF Radio with dual watch facility  
               1 set MF/ HF radio telephone  
               2 radar transponder (SART)  
               12 two-way hand-held VHF radios  
               1 x (EPIRB)  
               8nos hand held VHF  
  Marine integrated TVRO system  
  VSAT communication system  
VI HELIDECK Capable of  handling Sikorsky 92
VII MOORING SYSTEM Make: Mc Gregor Plimsoll, Singapore
  Electrical winches 12nos , 150T each
  Mooring anchors 12nos , 12T delta flipper
  Storm anchor 1nos , 5T Stockless
  Windlass / Tugger winch 1nos ,10T
  Constant Tension Winches 2 nos , 20Teach
  Slewing Crane 2nos , 15T each
VIII MAIN CRANE Make: ZPMC, China
  Classification society ABS
  Main hook Stationary over stern  
  Capacity

2000T fixed over stern with Tie-back ,
1600T fixed  over stern without Tie-Back

  Maximum machine list 1.50°
  Maximum machine trim 3.50°
  Working radii 22 to 32 m
  Main hook 1200 MT Revolving  
  Capacity 1200T
  Maximum machine list 3.50°
  Maximum machine trim 3.50°
  Working radii at 1200T 22 to 32 m (min radius 63m at 300T)
  Max hook height from deck 78m
  Auxiliary hook  
  Capacity 300T
  Maximum machine list 3.50°
  Maximum machine trim 3.50°
  Working radii 25 to 70 m
  Max hook height from deck 95m
  Whip hook  
  Capacity 50T
  Maximum machine list 3.50°
  Maximum machine trim 3.50°
  Working radii 28 to 78 m
  Max hook height from deck

100m

IX PIPELAY EQUIPMENT Make: PH Hydraulics, Singapore
  System performance  
  Pipe OD 6” to 60”
  Max. pipe joint weight 32000 kgf
  Pipe length 35 to 42 ft
  Nominal tension capacity – 1 tensioner 70000 Kgf @25m/min paying out
  Nominal tension capacity – 2 tensioners 140000 Kgf @25m/min paying out
  Max tension capacity – 1 A&R Winch 150000 Kgf @25m/min paying out
  Pipe Tensioner system Make: PH Hydraulics, Singapore
  2 No. Tensioners 70 T each
  1 no. A&R winch 150 T (Structure designed to upgrade upto 200T)
  1 Electrical Power Unit  
  1 Measurement Sheave  
  1 Remote Control Console  
  Floating STINGER 4Sections,  Alpha Pontoon Articulated Stinger
  Welding stations 5 nos.
  Coating Station 1nos
  NDT station 1nos
X POWER GENERATION Make: Cummins
  6  No. Diesel Generators 1230 KW each
  1 No. Emergency Generator 150 KW
  1 No. Standby Generator for Crane 72 KW
XI BALLASTING SYSTEM 3 Pumps of 1000 m3/hr capacity
XII WATER MAKER  
  2 No. R.O plants 150 Tons per day
XII PIPE HANDLING DAVITS Make: MacGregor Plimsoll, Singapore
  Quantity 6 Nos.
  Capacity 50T each
 
Crane load Charts
a. Hook Radius VsHook Height
 
b. Hook Radius Vs Hook Capacity
 
Vision & Values at MDL

MDL Energy is a niche player in the energy sector in India and plans to steadily grow and establish itself as a one stop shop for “Concept to Commissioning” through its in-house capabilities, experience and strength. Knowledge and skills are key to its success.

MDL values its work force and that of its partners as its biggest asset.

KEEL LAYING
LAUNCHING
CRANE LOAD TESTING
SEA-TRAILS
INSTALLATION OF JACKETS
INSTALLATION OF JACKETS
PILLING WORKS
PILLING WORKS
TOPSIDE INSTALLATIONS
TOPSIDE INSTALLATIONS
PIPE LAY OPERATIONS-FIRST 24” JOINT
 
 
PIPE-LAY SEQUENCE
PIPE-LAY SEQUENCE
PIPE-LAY SEQUENCE
PIPE-LAY SEQUENCE
PIPE-LAY SEQUENCE
PIPE-LAY SEQUENCE
PIPE LINE ON FULL STINGER
 